US Naval Academy

US Naval Academy

In 2004, the Chauvenet Hall project at the US Naval Academy was one of the most challenging projects to date in terms of scope, timing, and sheer size. The entire hall was gutted leaving basically a skeleton to be re‐fitted and completely renovated. The level of coordination and teamwork with all involved was paramount. Shoring and Brokk robotics were utilized like never before and the end result was astounding for which we were given a letter of commendation from The Whiting‐Turner Contracting Company on this very difficult project.

Submit a Comment

Your email address will not be published. Required fields are marked *