Construction renovations to allow new entertainment and shopping destination in Crystal City including new Cinema, Specialty Grocer, restaurants and bars.
- Project included extensive shoring, structural demolition and intricate saw cutting.
- Work was done in conjunction with our in-house structural engineer to collaborate and design systems to temporarily support existing structure during building modification.
- Designed hoist system to expedite debris removal out of existing garage 3 stories below grade.
- Installed temporary protections to ensure no damage to existing structure during demolition activities.
- Removed plaza level off the top of the existing parking garage to allow new structure to be erected.
- Created shaft openings throughout the existing garage for new stairs, elevators and escalators.
- Project presented challenges of working in and around an active parking garage and occupied spaces.